Sort the comments below by OLDEST to see a chronological timeline of the work we have completed so far.
This 2009 SV-211 was in the Hyco Flood of 2025. It was not damaged nearly as badly as some other boats, however the tower needs to be replaced, some gelcoat and fiberglass work is needed, and a few other things need to be addressed. Our client was lucky that it wasn't damaged further. Here's the boat as it arrived at our facility.







The cover for this boat was modified to fit around the new tower, and it got new support poles that snap into place to help with keeping water from pooling on the cover.
The audio is 100% complete, and the interior is all back in the boat. It is getting a final wash today and then it'll be ready to head home!
Here's another progress shot from the audio installation. All of the audio installation is complete, but I didn't take any pictures yet. The as-completed pictures will be posted tomorrow!
Although this picture doesn't show it super clearly, it is the best one I have to illustrate some creative mounting we did on the tower speakers for this boat. Instead of mounting the speakers to the rear bar, we mounted these to the connecting bar between the front and the back, and then rotated them 90°. This made for a cleaner look from the back, and gave us the ability to hide more of the wiring. It also gives more room to remove the rear bimini support bars if needed.
Just a couple more vinyl cleanup pictures: